News

Roadwork at Cedar Point


A view of Rolling Thunder Ave. shows work performed by WCA Construction, LLC to completely replace the roadway in a procedure called full-depth reconstruction. This method is required in this area, and four others in the Cedar Point subdivision, because the roadway has completely failed below the paved surface. All Cedar Point roads will be repaved this summer, with most scheduled for less intensive chip seal or two-inch overlay. Other areas with broken pavement are being crack sealed now. The work is administered by the Tribal Planning Department with 100% funding support from the BIA Tribal Transportation Program. Two-week rolling schedules of activity will appear each week in The Southern Ute Drum. For more information, contact Project Coordinator Mary Evening Star Eagle 970-563-2270.
Photo Credit: SU Tribal Planning
To top